Contents
Part 1: Guidance
Introduction
List of Acronyms
The Competent Person
Responsibilities
Planned Maintenance Systems (PMS)
Key Features of this Document
Completing the Document
References
PART 2: DETAIL SHEETS
Record of Inspections
Section 1 – General Safety
Section 2 – Dive Control
Section 3 – Surface Compression Chamber
Section 4 – Bell Launch and Recovery System
Section 5 – Diving Bell
Section 6 – Life Support Control
Section 7 – Main Bell Umbilical
Section 8 – Diver Heating System
Section 9 – Divers’ Umbilicals
Section 10 – Divers’ Personal Equipment
Section 11 – Compressors, Pumps, etc.
Section 12 – High Pressure Gas Storage
Section 13 – Diver Gas Reclaim
Section 14 – Chamber Gas Reclaim and Purification
Section 15.1 – General – HES System
Section 15.2 – HRU Interface with Dive System
Section 15.3 – Hyperbaric Rescue Unit (HRU)
Section 15.4 – HRU Launch and Recovery System
Revision
-
Rev. 3.4 - October 2024October 2024, Rev. 2.3 – Items added to Part 2 Sections 11 (5.10) and 12 (4.3)
-
Rev. 3.3 - July 2024Lifting terminology updated per IMCA Information Note nr. 1665
-
Rev. 3.2 - November 2023References to withdrawn AODC documents have been updated to current relevant IMCA references; references in Part 2 to appendices in D051 have been corrected
-
Rev. 3.1 - August 2022Updated to align with the guidance contained in IMCA LR001/HSS022/M194. Text of item dealing with diver emergency gas supply (bail-out) endurance slightly amended for clarity.
-
Rev. 3 - December 2021Updated to clarify any anomalies and bring the guidance into alignment with current industry good practice.
-
Rev. 2 - July 2014Updated to align the document with IMCA D018, D023 and D053. Section 15 split into four sub-sections and Section 16 on life support packages added.
-
Rev. 1 - March 2013Revised and updated to incorporate equipment improvements and changed operating practices since initial publication.
-
Rev. - June 2001Initial publication