Code of practice for the initial and periodic examination, testing and certification of diving plant and equipment

  • Recommended Practice
  • Revision 2.6 - October 2024

This document provides comprehensive guidance on the examination, testing, and certification of diving plant and equipment. It outlines the requirements for initial and periodic inspections, the role of competent persons, and the responsibilities of diving contractors, supervisors, and other personnel involved in diving operations.

Contents

  • Glossary

  • Introduction 

  • Certification and Classification 

  • The Competent Person 

  • Responsibilities 

  • Documentation 

  • Planned Maintenance Systems (PMS) 

  • Explanation of This Document 

  • Index to Detail Sheets 

  • Appendix 1 – Detail Sheets


Revision

  • Rev. 2.6 - October 2024
    Amendment of Detail Sheet 25.2 (When in Service table, and Notes)
  • Rev. 2.5 - July 2024
    IMCA internal audit update
  • Rev. 2.4 - May 2024
    Update of lifting terminology per Information Note 1665
  • Rev. 2.3 - December 2023
    Page 2, headers, footers, detail sheets & document map updated; no change to content
  • Rev. 2.2 - August 2022
    Aligning with guidance in IMCA LR001 / IMCA HSS022 / IMCA M194
  • Rev. 2.1 - March 2022
    Load test of lifting points on Man-Riding Basket/Bell (Detail Sheet 3) reduced from 1.5 times SWL to 1.25 times SWL
  • Rev. 0.2 - December 2021
    Updated to clarify any anomalies and bring the guidance into alignment with current industry good practice.
  • Rev. 0.1 - June 2014
    Updated to incorporate equipment improvements and changed operating practices since first publication
  • Rev. - February 1999
    Initial publication