Our analysis of the 1,539 reports on vessel inspections undertaken between April 2022 and April 2023 and uploaded into the eCMID database.
Contents
- Introduction
- Analysis of Inspection Findings
- Findings Related to IMCA Safety Flashes
- Inspection Report Quality Assurance Process
- Summary
- Appendix 1 - Full Results of eCMID Findings Analysis
- Appendix 2 - Full Results of eMISW Findings Analysis
Revision
-
Rev. - April 2024Initial publication