Recommended practice for remotely operated vehicle load testing and inspection
Addressing the examination and load testing of items on an ROV system.
Revision 1.3 | August 2024
Guidance
Recommended Practice
Scope
Glossary of Terms and Abbreviations
Objectives
Application
The Competent Person
Initial Supply
In-Service Inspection and Examination
Period Examination and Test
Retention of Certification
Maintenance
References
Appendices
Categories of Competence Person
Inspection, Testing and Maintenance of Portable Equipment Lifting Structure and Lifting Sets
Inspection, Testing and Maintenance of Subsea Package
Inspection, Testing and Maintenance of Miscellaneous Equipment
Date: Reason: Revision: Date:August 2024 Reason:Lifting terminology updated Revision:Rev. 1.3 Date:January 2024 Reason:Preface, bookmarking and references updated; no changes to content Revision:Rev. 1.2 Date:February 2019 Reason:Small amendment to appendix 3 Revision:Rev. 1.1 Date:January 2019 Reason:Remove the necessity for ROV dismantling for unnecessary NDE on frame and align with DNG GL-ST-E2.7 series of standards Revision:Rev. 1 Date:October 2016 Reason:Initial publication Revision:Rev. 0 -
Recommended practice for the examination of steel wire rope through magnetic rope testing (MRT)
Revision 2 | July 2024
Guidance
Recommended Practice
- Glossary of Terms
- Introduction
- Scope
- Background
- Health and Safety
- Principles of Operation - How Magnetic Rope Testing (MRT) Works
- Parameters
- Verification and Calibration
- Manufacturers' Operating Guidelines
- Competence and Training
- Interpretation of Data
- MRT Trace Reports
- Rejection Criteria
- Recording and Retention of Records
- References
Date: Reason: Revision: Date:February 2024 Reason:Amendment to MRT definition and addition of MFL definition; updating preface, reference links and layout Revision:Rev. 1.1 Date:October 2018 Reason:Extensive document revision which includes rejection criteria and MRT equipment operator levels of competence and training Revision:Rev. 1 Date:August 2009 Reason:Initial publication Revision:Rev. 0 -
Lifting Terminology: Appropriate Marking on Diving Equipment
The Lifting & Rigging Committee reviewed comments on the terminology used in IMCA’s Diving documents and on diving equipment.
Revision 0.2 | May 2024
Information Note
Other
-
Crane frictional component exchanges
The caution to be taken when renewing brake frictional components – such as brakes, clutch pads, and discs.
March 2024
Information Note
-
Guidance on the transfer of personnel to and from offshore vessels and structures
Revision 2.2 | March 2024
Guidance
Recommended Practice
Glossary of terms
Introduction
General Operating Procedures
Surface Vessel Transfers
References
Date: Reason: Revision: Date:March 2024 Reason:Refresh of page 2, reference links and layout; no changes to content Revision:Rev. 2.2 Date:May 2019 Reason:Revised to make slight changes to section 4.1 Revision:Rev. 2.1 Date:October 2018 Reason:Revised to include input from the geophysical survey sector Revision:Rev. 2 Date:June 2014 Reason:Revised to include input from the renewable energy sector Revision:Rev. 1 Date:March 2010 Reason:Initial publication Revision:Rev. 0 Date:May 2019 Reason:Revised to make slight changes to section 4.1 Revision:Rev. 2.1 Date:October 2018 Reason:Revised to include input from the geophysical survey sector Revision:Rev. 2 Date:June 2014 Reason:Revised to include input from the renewable energy sector Revision:Rev. 1 Date:March 2010 Reason:Initial publication Revision:Rev. 0 Date: Reason: Revision:Rev. 2.1