Find out more about the types of IMCA documents and our definitions
Total entries: 1
Grade | ||||
---|---|---|---|---|
Status | ||||
Access | ||||
From |
to
|
-
Recommended practice for remotely operated vehicle load testing and inspection
Addressing the examination and load testing of items on an ROV system.
Revision 1.3 | August 2024
Guidance
Recommended Practice
Scope
Glossary of Terms and Abbreviations
Objectives
Application
The Competent Person
Initial Supply
In-Service Inspection and Examination
Period Examination and Test
Retention of Certification
Maintenance
References
Appendices
Categories of Competence Person
Inspection, Testing and Maintenance of Portable Equipment Lifting Structure and Lifting Sets
Inspection, Testing and Maintenance of Subsea Package
Inspection, Testing and Maintenance of Miscellaneous Equipment
Date: Reason: Revision: Date:August 2024 Reason:Lifting terminology updated Revision:Rev. 1.3 Date:January 2024 Reason:Preface, bookmarking and references updated; no changes to content Revision:Rev. 1.2 Date:February 2019 Reason:Small amendment to appendix 3 Revision:Rev. 1.1 Date:January 2019 Reason:Remove the necessity for ROV dismantling for unnecessary NDE on frame and align with DNG GL-ST-E2.7 series of standards Revision:Rev. 1 Date:October 2016 Reason:Initial publication Revision:Rev. 0