Find out more about the types of IMCA documents and our definitions.
Our Guidance Register also lists documents in each series, with status, latest revision and a website link for details and downloading.
Total entries: 27
Grade | ||||
---|---|---|---|---|
Status | ||||
Access | ||||
From |
to
|
-
Requirements for IMCA-approved ROV introductory training courses
This document outlines the requirements for IMCA-approved ROV introductory training courses, detailing the purpose, approval process, course format, admission requirements, learning objectives, and syllabus.
Revision 4.9 | March 2025
Guidance
Recommended Practice
Introduction
Purpose of Course
Course Approval
Course Format
Admission Requirements for Trainees
Learning Objectives and Course Syllabus
Facilities, Course Equipment and Student Materials
Course Instructors
Trainee Assessment and Certification
References
Appendices
Evidence Portfolio
Simulator Portfolio
Example Trainee Certificate
IMCA Guide to Live Online Training
Date: Reason: Revision: Date:March 2025 Reason:Addition of Appendix 4 – IMCA Guide to Online Training Revision:Rev. 4.9 Date:November 2024 Reason:Removed sole use of Class 1 & 2A from training equipment, reworded Section 4.0 Revision:Rev. 4.8 Date:September 2024 Reason:Itemised simulator components added, and changed section 10 to appendix 1 Revision:Rev. 4.7 Date:July 2024 Reason:Requirements for hybrid training delivery amended in section 4 and to section 10 tables Revision:Rev. 4.6 Date:February 2024 Reason:Online training removed from options Revision:Rev. 4.5 Date:August 2023 Reason:Minor revision to section 10 tables Revision:Rev. 4.4 Date:June 2023 Reason:Minor update to section 5.1 Revision:Rev. 4.3 Date:February 2023 Reason:Minor revision to section 10 tables Revision:Rev. 4.2 Date:January 2023 Reason:Section 10 - Updated guidance on evidence portfolio requirements Revision:Rev. 4.1 Date:November 2022 Reason:Restructured to reflect IMCA G010 and training course approval scheme Revision:Rev. 4 Date:July 1996 Reason:Initial publication Revision:Rev. 0 -
Recommended practice for remotely operated vehicle load testing and inspection
Addressing the examination and load testing of items on an ROV system.
Revision 1.3 | August 2024
Guidance
Recommended Practice
Scope
Glossary of Terms and Abbreviations
Objectives
Application
The Competent Person
Initial Supply
In-Service Inspection and Examination
Period Examination and Test
Retention of Certification
Maintenance
References
Appendices
Categories of Competence Person
Inspection, Testing and Maintenance of Portable Equipment Lifting Structure and Lifting Sets
Inspection, Testing and Maintenance of Subsea Package
Inspection, Testing and Maintenance of Miscellaneous Equipment
Date: Reason: Revision: Date:August 2024 Reason:Lifting terminology updated Revision:Rev. 1.3 Date:January 2024 Reason:Preface, bookmarking and references updated; no changes to content Revision:Rev. 1.2 Date:February 2019 Reason:Small amendment to appendix 3 Revision:Rev. 1.1 Date:January 2019 Reason:Remove the necessity for ROV dismantling for unnecessary NDE on frame and align with DNG GL-ST-E2.7 series of standards Revision:Rev. 1 Date:October 2016 Reason:Initial publication Revision:Rev. 0 -
IMCA approval of ROV introductory training courses
Sharing changes for Members that provide ROV introductory training courses.
July 2024
Information Note
Other
-
Terms and conditions for ROV support services
This document outlines the terms and conditions for the provision of ROV Support Services, covering various aspects such as definitions, contract duration, scope of services, intellectual property rights, compensation, variations, inspection, warranty, indemnities, force majeure, termination, assignment, choice of law, insurance, consequential damages, independent contractor status, taxes, confidentiality, notices, third-party rights, health, safety & environment, limitation of liability, change in law, delay or downtime, embarkation and disembarkation, spares and consumables, survival, severability, and counterpart.
Revision 1.1 | June 2024
Guidance
Informative Guidance
Definitions and Interpretation
Entire Agreement
Contract Duration
Scope of Services
Intellectual Property Rights
Compensation
Variations (Alternative 1)
Inspection
Warranty
Indemnities
Force Majeure
Termination of Contract
Assignment
Choice of Law
Insurance
Consequential Damages
Independent Contractor
Taxes
Confidentiality
Notices
Contracts (Rights of Third Parties) Act 1999
Health, Safety & Environment
Limitation of Liability
Change in Law
Delay or Downtime
Embarkation and Disembarkation
Spares and Consumables
Survival
Severability
Counterpart
Appendix 1 – Scope of Services
Appendix 2 – Compensation Schedule
Date: Reason: Revision: Date:June 2024 Reason:Page 2, template and bookmarking updated; no change to content Revision:Rev. 1.1 Date:July 2017 Reason:To reflect present industry practice. To include the IMCA competition law compliance policy (annex 1) Revision:Rev. 1 Date:February 2002 Reason:Initial publication Revision:Rev. 0 -
IMCA ROV services contracting principles
This document provides guidance on risk allocation and best practices for contracting in the marine industry as it relates to Remotely Operated Vehicles.
Revision 3.1 | June 2024
Guidance
Informative Guidance
Introduction
Company Group and Contractor Group Property and Personnel
Pollution
Third Parties
Consequential Loss
Gross Negligence and Wilful Misconduct
Warranty Obligations
Limitation of Liabilities
Force Majeure and Suspension
Delay
Variation Orders
Intellectual Property Rights
Termination by Company for Convenience
Company's Obligation to Pay Contractor
Extraordinary Risk
Breakdown of ROV Equipment
Special Support for any ROV Entangled, Trapped or Lost
Special Indemnity for any ROV Entangled, Trapped or Lost
Contracts (Rights of Third Parties) Act 1999
Anti-Corruption
Date: Reason: Revision: Date:June 2024 Reason:Page 2, template and bookmarking updated; no change to content Revision:Rev. 3.1 Date:February 2017 Reason:Alignment with IMCA general contracting principles (Rev. 4) Revision:Rev. 3 Date:April 2016 Reason:Alignment of 'lost ROV' clauses Revision:Rev. 2 Date:December 2014 Reason:Alignment with IMCA general contracting principles Revision:Rev. 1 Date:December 2001 Reason:Initial publication Revision:Rev. 0