The Jersey Maritime Administration has published a report into its investigation of the causes of an allision between a windfarm support vessel and a windfarm tower in the Southern North Sea on 23 April 2020.

The report can be found on the web here.

What happened?

Shortly after 1800 local time, the vessel was released from duties on a windfarm and at 1811 departed for the return passage to port. Aboard the vessel were three crew members, and one windfarm technician who was being transferred ashore. Sea conditions were calm with light winds and low swell. Weather was fair with good visibility.

Whilst transiting between windfarms at approximately 20 knots, Njord Forseti hit a turbine tower. The impact resulted in serious damage to the vessel. Two crew members were evacuated by air to hospital, and the third was required to have a subsequent medical examination. Immediate assistance was provided by a nearby offshore construction vessel. The Njord Forseti returned to port under her own power with temporary crew members provided by a sister vessel.

Whilst transiting between windfarms at approximately 20 knots, Njord Forseti hit a turbine tower

Findings

The Jersey Maritime Administration report drew the following conclusions:

  • For an indeterminate period between departure from the windfarm until the incident occurred, the vessel crew were not keeping a proper look out as required by Rule 5 of the International Regulations for Preventing Collisions at Sea (COLREGS).

  • The primary reason why a proper lookout was not being kept was because the Master was distracted from his primary role.

  • It is possible that the Master was distracted from his primary role as he may have been adjusting of settings on the VHF radio which is mounted immediately to starboard of his seat. However, this has not been positively determined and distractions caused by other means cannot be ruled out.

  • At the time of the incident the vessel was not following the established passage plan from the windfarm to port, but was undertaking an alternative route. Whilst this route was safe, ineffective monitoring of the vessels track, position and proximity to navigational hazards contributed to the incident.

Recommendations

The Jersey Maritime Administration report made the following recommendations:

  • There should be renewed emphasis on the importance of compliance with COLREGS, and particularly Rule 5.

  • Identify tasks, equipment and functions that may give rise to possible distractions for the person having the conduct of a vessel whilst underway, and implement measures to ensure that the safe conduct of the vessel is not impaired by these or other factors.

  • Review the methods by which Masters monitor the safe progress of a vessel’s passage and make changes as necessary, including where necessary, additional training.

  • Under the Workboat Code, other than the need for at least one person to ensure the safe conduct of the vessel whilst underway, there is no specified minimum number of (deck) watchkeepers required. Operations should be assessed and policies updated where necessary to ensure that the wheelhouse is always sufficiently and appropriately manned. Where appropriate, specific guidance should be provided to the Master in exercising his / her judgement in setting the wheelhouse manning level during the course of a voyage (IMCA emphasis).

  • Develop principles and techniques of crew resource management (CRM) to ensure that whilst underway the conduct of the vessel is carried out in the most effective and efficient means possible.

Members may wish to refer to

  • Seamanship: Vessel Collision With Fishing Boat

  • Small Workboats used on offshore wind farms: combined report on Windcat 9 and Island Panther incidents

  • Collision Between Crew Boat And Anchored Barge

Latest Safety Flashes:

Main Crane failure during load test

At maximum load, the crane main block wires broke and the testing load fell, along with the main block, into the water.

Read more
AC vent unit cover dislodged and fell 1.7m

AC cover of a capstan electrical cabinet became detached and fell approximately 1.7 meters.

Read more
Dropped sheave and clump weight

A high potential dropped object incident occurred when a sheave weighing 204kg fell 64m to deck.

Read more
UK HSE: Incident during rig decommissioning leads to fatality

UK HSE press release: incident whilst decommissioning rig.

Read more
Positive: successful rescue of surfer on the open sea

The crew of a small pilot boat at sea spotted a surfer in distress.

Read more

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of the entire offshore industry.

The effectiveness of the IMCA Safety Flash system depends on the industry sharing information and so avoiding repeat incidents. Incidents are classified according to IOGP's Life Saving Rules.

All information is anonymised or sanitised, as appropriate, and warnings for graphic content included where possible.

IMCA makes every effort to ensure both the accuracy and reliability of the information shared, but is not be liable for any guidance and/or recommendation and/or statement herein contained.

The information contained in this document does not fulfil or replace any individual's or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.

Share your safety incidents with IMCA online. Sign-up to receive Safety Flashes straight to your email.