Oil production riser gas ignition

  • Safety Flash
  • Published on 9 October 2020
  • Generated on 27 February 2026
  • IMCA SF 29/20
  • 2 minute read

What happened?

During recovery of a 10” oil production riser at an FPSO, gas in the riser bore ignited and a smoke cloud was seen on deck in the vicinity of the shear cutter. The vessel Master was on the bridge and saw the occurrence. Crew were working nearby on the horizontal lay system (HLS) and work platform removing buoyancy modules and inner clamps.

The pre-cut subsea hog bend slit on the riser was below the work platform at this point; hot work was being carried out approx. 1 metre above to remove retaining bands. Three crew were forward working with a forklift and positioning buoyancy modules into open top containers, when a noise was heard on deck.

There were no injuries and no damage to equipment.

During recovery of a 10” oil production riser at an FPSO, gas in the riser bore ignited and a smoke cloud was seen on deck in the vicinity of the shear cutter
hot work was taking place for removal of buoyancy modules
log of events

What were the causes? / What went wrong?

Our Member’s analysis brought the following results:

  • Underlying cause: A slit was completed to mitigate an identified hazard, however it also introduced a new hazard that resulted in current incident. This hazard was not identified in HAZID or HAZOP & Risk Assessment sessions onshore. New elements were introduced to the procedure without identifying the new risk. When introducing new elements to a procedure, all consequences (if any) must be investigated.

  • Immediate cause: Ignition of gas in riser bore with smoke exiting at shear cutter end due to spark from hot work being carried out at the HLS platform – opposite end.

  • Root Cause: Slit in riser outer sheath through into riser bore allowed air ingress and gave a path for any hot sparks to ignite any residual gas in the riser bore.

Actions

Members may wish to refer to:

  • HSS001 Guidelines for management of change

Latest Safety Flashes:

Fall from height during mooring due to rope tension reaction

Rope became entangled with the propellor during mooring operations of a tanker causing the operator to lose balance and fall onto the lower platform.

Read more
Missing protection – progressive wear on hydraulic hoses causes damage

During an inspection, several hydraulic hoses and fuel hoses were found in direct contact with surrounding surfaces and sharp edges.

Read more
Small engine room fire – flammable object ignited

While ramping up the starboard main engine, a small flammable foreign object ignited.

Read more
Positive: damage to Fast Rescue Craft davit wire rope caught before failure

During routine checks, it was observed that the FRC davit wire rope had a visible fracture at the socket termination area.

Read more
BSEE: Miscommunication and trapped pressure causes injury during valve maintenance

BSEE has published Safety Alert 509 relating to a gas release incident on an offshore platform.

Read more

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of the entire offshore industry.

The effectiveness of the IMCA Safety Flash system depends on the industry sharing information and so avoiding repeat incidents. Incidents are classified according to IOGP's Life Saving Rules.

All information is anonymised or sanitised, as appropriate, and warnings for graphic content included where possible.

IMCA makes every effort to ensure both the accuracy and reliability of the information shared, but is not be liable for any guidance and/or recommendation and/or statement herein contained.

The information contained in this document does not fulfil or replace any individual's or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.

Share your safety incidents with IMCA online. Sign-up to receive Safety Flashes straight to your email.