The United States Bureau of Safety and Environmental Enforcement (BSEE) has published Safety Alert 460 relating to a dropped object during lifting operations.

What happened?

While conducting crane operations during decommissioning/well abandonment, a 350kg crane “headache ball” fell 8 m to deck and landed less than 60 cm from one of the riggers.     

While conducting  crane operations during decommissioning/well abandonment, a 350kg crane “headache  ball” fell 8m to deck and landed less than 60cm from one of the riggers.
A crane was moving a 200kg (400 lb) well cap when a wedge socket on the auxiliary line snagged on the flange of a  C-channel located at the edge of the platform’s rig deck. The lift required running the crane’s auxiliary line within  centimetres of the edge of the platform. It was a “blind lift,” directed by a rigger using radio communications. The  rigger was standing on the pipe deck and had a clear view of the load, line, pedestal crane, and crane operator.
The rigger, not seeing any movement, repeated a request to lower the load. Because the crane operator could not  see the winch drum behind the crane cab, he did not see that the load was not moving and responded that he was  still lowering the load. As the crane operator continued to unwind the auxiliary line at the winch drum, the wedge  socket slipped off the flange of the C-channel, releasing the snag. The headache ball fell 8m and hit the deck less  than 60cm from one of the riggers guiding the load.

A crane was moving a 200kg (400 lb) well cap when a wedge socket on the auxiliary line snagged on the flange of a C-channel located at the edge of the platform’s rig deck. The lift required running the crane’s auxiliary line within centimetres of the edge of the platform. It was a “blind lift,” directed by a rigger using radio communications. The rigger was standing on the pipe deck and had a clear view of the load, line, pedestal crane, and crane operator. His location put him approximately 9m from the load line.

The wedge socket above the headache ball snagged on the C-channel flange that ran across the length of the edge of the deck. This snag temporarily held all the weight of the load and rigging, resulting in a false reading on the auxiliary winch – the load cell sending a weight signal to the operator was below the snagged wedge socket.

The crane operator did not detect that the auxiliary winch was no longer holding the weight of the load. The rigger did not realize that the line had snagged on the C-channel and continued giving directions to keep lowering the load. As the load cell was positioned below the snag, there was no change in the load signal, even though the weight of the load was now being supported by the C-channel and not the auxiliary winch. 

The rigger, not seeing any movement, repeated a request to lower the load. Because the crane operator could not see the winch drum behind the crane cab, he did not see that the load was not moving and responded that he was still lowering the load.  As the crane operator continued to unwind the auxiliary line at the winch drum, the wedge socket slipped off the flange of the C-channel, releasing the snag.  The headache ball fell 8m and hit the deck less than 60cm from one of the riggers guiding the load.

What went wrong?

BSSE identified several contributing factors:

  • The rigger and crane operator should have noticed the auxiliary winch was no longer detecting the weight of the load.

  • The engineered controls (i.e. weight indicator) provided an inaccurate representation to the crane operator of the weight on the winch due to the wedge socket snagging above the load cell.

  • The crane operator and rigger failed to recognise something was wrong after repeated requests to lower the load and after receiving the response that the line was being lowered and not seeing any movement in the load position.

  • The rigger did not check the path of the auxiliary line for potential snags.

  • The work team ought have noticed the potential hazards of working close to the C-channel at the edge of the platform rig, and should have recognised the potential snag points.

  • No formal risk assessment was conducted. However, a review of the task was performed.

Actions

  • Ensure a secondary device (e.g. weight indicator, camera) is accessible to detect any slack on the load line.

  • Identify all potential rigging contact or snag points and include them in worksite instructions, risk assessments, and toolbox talks – particularly when working close to other equipment or structures.

  • Ensure fully agreed, understood and practised / tested communication between crane driver and rigging crew.

  • Ensure a full and thorough lift plan is place before the job is started.

  • What would you have done to avoid this situation? Discuss what key controls are in place to remove yourself and your team members from the potential “line of fire”.

Latest Safety Flashes:

Structural failure of rescue boat

A rescue boat suffered a catastrophic structural failure whilst unattended on the davit.

Read more
High potential: spontaneous opening of hydraulic release shackle (HRS) pin

During lifting operations on a vessel, a hydraulic release shackle pin opened on its own.

Read more
NTSB: diesel generator engine failure

The National Transportation Safety Board of the United States (NTSB) published "Safer Seas Digest 2023".

Read more
LTI: fall from height during anchor chain handling operation

A worker fell through an opening from one deck to another, and was injured as a result.

Read more
Sudden disconnection of pressurised hose

A contractor was performing maintenance on the bulk cargo methanol system on deck of a vessel.

Read more

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of the entire offshore industry.

The effectiveness of the IMCA Safety Flash system depends on the industry sharing information and so avoiding repeat incidents. Incidents are classified according to IOGP's Life Saving Rules.

All information is anonymised or sanitised, as appropriate, and warnings for graphic content included where possible.

IMCA makes every effort to ensure both the accuracy and reliability of the information shared, but is not be liable for any guidance and/or recommendation and/or statement herein contained.

The information contained in this document does not fulfil or replace any individual's or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.

Share your safety incidents with IMCA online. Sign-up to receive Safety Flashes straight to your email.