What happened?

A 2″ diameter pipeline dewatering hose had been deployed to the seabed, supported at 20m intervals by cable socks (Chinese fingers) on a winch wire. The water depth was 380 m.

After a period of several hours it was found that most of the cable socks had moved down the winch wire, causing the full weight of the hose to be taken on the cable socks above, which subsequently broke. The weight of the hose was then transferred to the slack section of hose on the deck of the deployment vessel. The dewatering operation was aborted and a controlled abandonment of the hose and support rigging onto the vessel was carried out.

Our member’s investigation revealed the following:

The investigation found that the cable socks were not suitable for this duty:

  • Their design load was much higher than their working load and they did not develop an adequate grip on the winch wire.
  • They were constantly tensioned due to swell heave on the hose and were, therefore, able to relax their bite on the wire.
  • The use of cable socks on a winch wire (a very hard surface in comparison to a cable’s outer sheath) was not appropriate.

The investigation also identified some important system causes into the failure:

  • Although a simulated test on a cable sock was carried out on the deck of the vessel, it wasn’t representational of the cyclic loading conditions subsea.
  • The risk assessment process, although extensive, had not addressed this use of cable socks. This rigging feature was added at a later date and was not adequately risk assessed.

The following actions were taken:

Subsequently, an alternative method of rigging was developed, employing clamps onto the support wire and the dewatering operation was successfully completed.

Latest Safety Flashes:

Dropped GRP cover during subsea lifting

A vessel was lifting and relocating a Pipe Line End Manifold (PLEM) GRP Top Cover when the load became detached and dropped approx. 7m.

Read more
Umbilical support frame made contact with passing vehicle on public road

Whilst travelling, a contractor transporting umbilical support frames (USFs) made contact with a passing vehicle as one of the frames dropped down.

Read more
Petrol driven equipment left stored in an emergency generator room

Stored snowblower created an unnecessary fire and explosion risk, as well as blocking access around critical equipment.

Read more
Mechanic got burns due to fire in portable generator

During refuelling, petrol (gasoline) spilled around generator and ignited.

Read more
Some positive findings and good practices

Collection of some positive findings and good practices.

Read more

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of the entire offshore industry.

The effectiveness of the IMCA Safety Flash system depends on the industry sharing information and so avoiding repeat incidents. Incidents are classified according to IOGP's Life Saving Rules.

All information is anonymised or sanitised, as appropriate, and warnings for graphic content included where possible.

IMCA makes every effort to ensure both the accuracy and reliability of the information shared, but is not be liable for any guidance and/or recommendation and/or statement herein contained.

The information contained in this document does not fulfil or replace any individual's or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.

Share your safety incidents with IMCA online. Sign-up to receive Safety Flashes straight to your email.