A piece of timber weighing 7.6 kg fell approximately 10 m from a crane jib and landed on the main deck.

What happened?

A  piece of timber fell from a crane jib and landed on deck. The main crane on the vessel was being prepared for lifting operations by four deck crew and the crane operator. 

When the crane hooks were disconnected, the deck crew moved clear to allow the crane operator to start luffing the jib from the cradle. 

As the jib was slewing around, the crane operator observed an object fall from a height of approximately 10 metres to the main deck.

No-one was nearby – the nearest crew were 15 m away from where it landed. 

The dropped object was identified as a piece of timber, weighing 7.6 kg. This had been used in a temporary repair of the dunnage on the boom rest.

Main crane and boom rest

Main crane and boom rest

Section of timber after dropping onto the deck

Section of timber after dropping to the deck

What went wrong?

  • Initial design did not sufficiently address the lateral movements of the jib in the boom rest.

  • Responsibility for the crane and associated equipment was not clearly understood.

  • The temporary repair:

    • Several onboard inspections and third-party inspections were conducted which did not identify issues with the support dunnage and subsequent temporary repairs.

    • The damaged wooden packer was formally reported nearly a year earlier. This report had been closed out prematurely when a temporary repair was made.

    • The temporary repair was put in place using screws rather than bolts to attach a board over the damaged wooden packer. The screws corroded, causing the board to become loose and fall to the deck.

    • A work order had not been created for remedial works on the damaged support timbers.

  • There was no checklist developed to include inspection of the boom rest.

Actions

  • Ensure roles and responsibilities are clearly defined, communicated and understood.

  • Review all lifting appliances, supports and cradles. Ensure that the equipment is maintained in its as built condition.

  • Confirm that the boom rest is part of the vessel planned maintenance system.

  • Ensure crane inspection checklists include inspection of the boom rest.

  • Confirm areas around crane boom rests are included in hazard hunts for potential dropped objects.

Members may wish to refer to:

Latest Safety Flashes:

Fall from height during mooring due to rope tension reaction

Rope became entangled with the propellor during mooring operations of a tanker causing the operator to lose balance and fall onto the lower platform.

Read more
Missing protection – progressive wear on hydraulic hoses causes damage

During an inspection, several hydraulic hoses and fuel hoses were found in direct contact with surrounding surfaces and sharp edges.

Read more
Small engine room fire – flammable object ignited

While ramping up the starboard main engine, a small flammable foreign object ignited.

Read more
Positive: damage to Fast Rescue Craft davit wire rope caught before failure

During routine checks, it was observed that the FRC davit wire rope had a visible fracture at the socket termination area.

Read more
BSEE: Miscommunication and trapped pressure causes injury during valve maintenance

BSEE has published Safety Alert 509 relating to a gas release incident on an offshore platform.

Read more

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of the entire offshore industry.

The effectiveness of the IMCA Safety Flash system depends on the industry sharing information and so avoiding repeat incidents. Incidents are classified according to IOGP's Life Saving Rules.

All information is anonymised or sanitised, as appropriate, and warnings for graphic content included where possible.

IMCA makes every effort to ensure both the accuracy and reliability of the information shared, but is not be liable for any guidance and/or recommendation and/or statement herein contained.

The information contained in this document does not fulfil or replace any individual's or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.

Share your safety incidents with IMCA online. Sign-up to receive Safety Flashes straight to your email.