Diver injury during air cylinder recharging

  • Safety Flash
  • Published on 28 July 2010
  • Generated on 22 February 2025
  • IMCA SF 05/10
  • 2 minute read

A member has reported a blown-out pillar valve resulting in injury to a diver working on deck.

What happened?

The diver had been assigned to recharge a number of bale-out cylinders using compressed air, considered by the member to be part of ‘routine’ operations. The recharging was performed in a dedicated open deck area. In this instance, the recharging of this particular air cylinder was being carried out for the first time onboard, as the cylinders had been delivered to the worksite empty due to safety consideration during transportation.

After hearing a loud noise, members of the dive team immediately proceeded to the recharging station where the injured diver, who had been working alone, was found laying down on the deck bleeding around his right eye. The cylinder pillar valve was found to be disconnected from the air cylinder.

The injured diver was found to be unconscious but regained consciousness after having been moved to a safe location.

Medical treatment procedures were initiated, resulting in the injured diver being given first aid on-site and subsequent medevac to shore.

Position of injured diver
Injured diver

This photo may show graphic content.

The incident investigation carried out by the member company found that the diver had sustained a head injury due to the accidental disconnection of the air cylinder’s pillar valve, coupled with the filling hose of the air compressor contacting the diver’s head.

The investigation showed the root cause of the incident to be an incorrect coupling between the pillar valve and the air cylinder in that the pillar valve had an external metric thread of M25x2 whilst the cylinder had a Whitworth imperial thread of 1 inch (25.4 mm). The two threads are technically incompatible and did not provide a correct connection between the pillar valve and the air cylinder.

Pillar valve
Pillar valve

The investigation further found that the assembly procedure had not complied with EN 250-2000 and EN 144-1; a company requirement where only metric threads are to be used.

The member stopped all activities, checked all air cylinder threads and pillar valve threads for compatibility, ensured their appointed subcontractor had developed working procedures and instructions for marking and checking pillar valves and air cylinders, and ensured that a QHSE (quality, health, safety & environment) audit of the subcontractor had been performed onboard and at their premises onshore.

The member company further stipulated that a dedicated JSA/HAZID was to be developed for each critical operation.

Latest Safety Flashes:

Crew transfer vessel (CTV) drifts onto turbine tower

A CTV drifted into and hit a nearby structure at 0.5 knots.

Read more
LTI: Fall from height during FRC maintenance

A worker fell 2.3 m to deck from a small boat in the davit, and broke a leg as a result. 

Read more
Near miss: narrowly avoided fall from height due to missing deck gratings

After a grating was removed, the Chief Engineer, on the way to inspect the work, nearly fell 4-5m.

Read more
MSF: A broken stretcher could have led to injury

The Marine Safety Forum (MSF) published Safety Alert 24-09 relating to a broken stretcher.

Read more
Positive story: Excellent galley hygiene and housekeeping

On a walk-around audit, a member highlights very high standards of housekeeping and hygiene in the galley on one of its vessels.

Read more

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of the entire offshore industry.

The effectiveness of the IMCA Safety Flash system depends on the industry sharing information and so avoiding repeat incidents. Incidents are classified according to IOGP's Life Saving Rules.

All information is anonymised or sanitised, as appropriate, and warnings for graphic content included where possible.

IMCA makes every effort to ensure both the accuracy and reliability of the information shared, but is not be liable for any guidance and/or recommendation and/or statement herein contained.

The information contained in this document does not fulfil or replace any individual's or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.

Share your safety incidents with IMCA online. Sign-up to receive Safety Flashes straight to your email.