A member has reported a fatal incident which occurred during anchor handling operations.

What happened?

The incident occurred on an anchor handling tug (AHT) whilst crew were attempting to disconnect an anchor buoy (weighing 1.4 tons) from its pennant wire shortly after retrieval.

The anchor buoy was winched onto the deck of the AHT until the pennant was in the wire stopper used to prevent the buoy from being pulled back towards the stern by sudden tension on the pennant wire. (See Fig. 1 Step 1.) Two crew members were disconnecting a shackle between the pennant wire connected to an anchor on the seabed and the buoy on deck (See Fig.1 Step 2), when suddenly the pennant wire came under tension. The wire stopper failed to stop the pennant wire effectively and the sudden tension on the pennant wire jerked the buoy towards the stern of the vessel. The two crew members who were busy disconnecting the shackle where struck by the moving buoy. (See Fig. 1 Step 3). One crew member died instantly, the other suffered a minor injury.

Root cause

Our member conducted an investigation and the root cause of the incident was determined to be that the wire stopper failed to stop the pennant wire. This happened because an incorrect (oversized with respect to the diameter of the pennant wire) ‘U-shaped insert’ was mounted into the wire stopper. This ‘U-shaped insert’ also displayed excessive wear and tear. (See Figures 3 & 4) As a consequence of this the socket at the end of the pennant was able to pass through the wire stopper when the pennant wire came under tension.

The sudden tension on the pennant wire came about because the survey screen on the bridge of the AHT displayed a ‘design anchor position’ instead of the ‘as laid’ anchor position. Based on the information presented by the survey screen, it was assumed that there was sailing slack in the pennant wire when in fact, it was being tensioned. (See Figure 2)

Recommendations and corrective actions

Our member made the following recommendations and corrective actions:

  • A thorough check of the wire stopper’s exchangeable parts should be made to ensure that it is adequate to handle the actual pennant wire diameter, and this should be recorded
  • A monthly inspection and check on wear and tear of the wire stopper equipment should be added to the vessel’s planned maintenance system
  • The ‘as laid’ information of the anchor should be provided by the positioning subcontractor and displayed on the survey screen
  • The survey screen provided by the positioning subcontractor should be considered an additional tool to provide an assumed anchor location to the AHT, but this location should never be interpreted as representing the actual anchor position. A warning message to this effect should be displayed on the survey screen
  • A dedicated watch should be maintained throughout the operation of buoy recovery on the direction and tension of the pennant wire.
Figure 1 – Schematic diagrams of incident

Figure 1 – Schematic diagrams of incident

Figure 2 – Actual and design anchor positions

Figure 2 – Actual and design anchor positions

Figure 3 – Incorrect ‘U-shaped insert’

Figure 3 – Incorrect ‘U-shaped insert’

Figure 4 – Correct ‘U-shaped insert’

Figure 4 – Correct ‘U-shaped insert’

Swipe to see next image

Latest Safety Flashes:

Structural failure of rescue boat

A rescue boat suffered a catastrophic structural failure whilst unattended on the davit.

Read more
High potential: spontaneous opening of hydraulic release shackle (HRS) pin

During lifting operations on a vessel, a hydraulic release shackle pin opened on its own.

Read more
NTSB: diesel generator engine failure

The National Transportation Safety Board of the United States (NTSB) published "Safer Seas Digest 2023".

Read more
LTI: fall from height during anchor chain handling operation

A worker fell through an opening from one deck to another, and was injured as a result.

Read more
Sudden disconnection of pressurised hose

A contractor was performing maintenance on the bulk cargo methanol system on deck of a vessel.

Read more

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of the entire offshore industry.

The effectiveness of the IMCA Safety Flash system depends on the industry sharing information and so avoiding repeat incidents. Incidents are classified according to IOGP's Life Saving Rules.

All information is anonymised or sanitised, as appropriate, and warnings for graphic content included where possible.

IMCA makes every effort to ensure both the accuracy and reliability of the information shared, but is not be liable for any guidance and/or recommendation and/or statement herein contained.

The information contained in this document does not fulfil or replace any individual's or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.

Share your safety incidents with IMCA online. Sign-up to receive Safety Flashes straight to your email.