Thruster failure and unavailability

  • DP Event
  • Published on 30 June 2016
  • Generated on 26 December 2024
  • DPE 02/16
  • 1 minute read

Undesired event

The crew followed good procedures by suspending operations in a controlled manner ready for investigation.

DPE 16.02 – Thruster failure and unavailability – Flowchart

Considerations

The crew followed good procedures by suspending operations in a controlled manner ready for investigation.


The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.

IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.

Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.