Swift action saved stress – Know your vessel
- DP Event
- Published on 13 December 2021
- Generated on 22 February 2025
- DPE 04/21
- 2 minute read
Observation
Jump to:
Familiarity of Key DP Personnel with the vessels Critical DP systems can lead to a successful outcome following a failure.

Comments
This is a positive report which highlights how familiarity of Key DP Personnel with the vessels Critical DP systems can lead to a successful outcome following a failure, which in this case had the potential to remove one redundant group.
We can all get into these situations, but it is how we react to them that defines us.

Example of the centralised LTFW system
Considerations
This event highlights the need for DP Key Personnel having good knowledge of their roles within the DP system of their vessel.
Qualification and Knowledge Requirements of Key DP Personnel (IMCA M117), Section 7– gives guidance for Key DP Personnel.
The report highlights the importance of the detection elements of the DP system, and the requirements for periodic testing, such as low-level alarms and pressure transducers.
Although not related to the event the number of same principle references seems inadequate. IMO MSC Circ. 645 and IMO MSC.1 Circ. 1580 guidance documents state that for DP 2 or 3 operations:
There is a requirement for 3 independent position references simultaneously available during operation based on two different principles.
Latest DP incidents
-
Thorough preparation is key
With 4 of 8 diesel generators running and connected to a closed ring bus, and 7 of the 8 thrusters selected to DP, a DP equipment class 3 MODU was set up in Green mode whilst on standby.
DPE 03/24
5 November 2024
Incident
-
There – but not really there
This DP event occurred on a DP equipment class two supply vessel whilst carrying out cargo operations on the starboard side alongside the asset and working at the lee side in the drift-off position.
DPE 03/24
5 November 2024
Incident
-
Equipment Class 3, even if you operate as 'Class 2'
This case study examines a DP incident on an equipment class 3 multi-purpose vessel while operating in good conditions.
DPE 03/24
5 November 2024
Incident
-
Line of sight
This case study covers events onboard a DP equipment class 2 vessel whilst holding position in a turbine field, with three position reference systems selected into DP – DGPS, HPR and Fanbeam.
DPE 03/24
5 November 2024
Incident
-
DP Drill Scenario
DP emergency drill scenarios are included to assist DP vessel management, DPOs / Engineers, and ETOs in conducting DP drills onboard.
DPE 03/24
5 November 2024
Incident
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.