Three DP System connected gyros heading froze within five minutes of time. With all three gyros out of service, drillship’s DP Model took over.
What happened?
Three DP System connected gyros heading froze within five minutes of time. With all three gyros out of service, drillship’s DP Model took over. 34 minutes later all gyros had been rebooted and were online in the DP System. Gyros were of modern fibre optic style.
The max excursion of vessel position was 20 meters over 34 minutes. Calm weather was benign enough to allow accurate model control of drilling vessel for duration of 34 minutes. Drillship was connected to well head while tripping into hole when incident occurred but emergency disconnect was not required.
What went wrong?
The investigation is ongoing which will require analysis of all three gyros in a laboratory by original manufacturer. Nothing can be stated conclusively until root cause analysis and investigation is complete. Drillship had been in service less than a year at the time of the incident.
What were the causes of the incident?
As of the writing of this safety flash, the proximate cause is unknown. Initial review reveals observations that may or may not have contributed to this incident, in whole or part and is not intended to reflect negatively upon any vendor or operators approach to construction/design:
- Commonality of three identical make and model gyros with common software, firmware, and hardware.
- Common backup 24 volt power source among three gyros could have allowed voltage instability to affect all three gyros at the same moment in time.
- Out of date firmware existed on three gyros.
- Automatic feed of GPS inputs existed.
- Manufacturer’s technical bulletins existed but it remains unclear if that is relevant.
- Simultaneous initial power-up start time of internal gyro clocks in shipyard possible.
- Unknown age of gyros installed in shipyard.
What lessons were learnt?
- An active, approved & well-rehearsed Well Specific Operating Guideline (WSOG) contributed to the safe reaction of on-board staff.
- Calm weather contributed to the effectiveness of the DP Model.
- Open and clear communications are crucial to successful response and resolution.
- Common mode faults should be interrupted thru use of different brands, different power connections, and thoroughly tested during a Failure Mode Effect and Analysis (FMEA) conducted by an independent third party.
- Concerns identified during FMEA testing should be followed up by management and risk assessed according to IMCA/industry.
Actions
Deep root cause analysis is to be conducted and a step change to installed equipment is ongoing.
Latest DP incidents
-
Thorough preparation is key
With 4 of 8 diesel generators running and connected to a closed ring bus, and 7 of the 8 thrusters selected to DP, a DP equipment class 3 MODU was set up in Green mode whilst on standby.
DPE 03/24
5 November 2024
Incident
-
There – but not really there
This DP event occurred on a DP equipment class two supply vessel whilst carrying out cargo operations on the starboard side alongside the asset and working at the lee side in the drift-off position.
DPE 03/24
5 November 2024
Incident
-
Equipment Class 3, even if you operate as 'Class 2'
This case study examines a DP incident on an equipment class 3 multi-purpose vessel while operating in good conditions.
DPE 03/24
5 November 2024
Incident
-
Line of sight
This case study covers events onboard a DP equipment class 2 vessel whilst holding position in a turbine field, with three position reference systems selected into DP – DGPS, HPR and Fanbeam.
DPE 03/24
5 November 2024
Incident
-
DP Drill Scenario
DP emergency drill scenarios are included to assist DP vessel management, DPOs / Engineers, and ETOs in conducting DP drills onboard.
DPE 03/24
5 November 2024
Incident
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.