Inadequate Position Reference Systems caused incident
- DP Event
- Published on 3 December 2020
- Generated on 26 December 2024
- DPE 04/20
- 2 minute read
Incident
Jump to:
Inadequate risk assessment was not completed and TAM and ASOG were not thoroughly reviewed prior to their approval.
Comments
It is mentioned in the report that task appropriate mode (TAM) and activity specific operating guidelines (ASOG) were in use, with the limitation identified for two DGNSS subject to common mode failure.
Considerations
- Use of only two DGNSS was contrary to the MSc.1 / Circ. 1580 requirements. This meant the vessel was not set up in accordance with DP class 2 requirements of 3 position reference systems based on at least two different principles.
- Vessel sensors selection did not appear to comply with DP class 2 requirements, though this non-compliance was not a factor in the incident.
- Task appropriate mode was in place, indicating that a loss of position was acceptable. However, the incident indicates that an adequate risk assessment was not done and TAM and ASOG were not thoroughly reviewed prior to their approvals.
- When the vessel lost its automatic DP control due to the loss of all its PRSs, the position could have been maintained for a period of time using the DP mathematical model.
- The report states that interference from a faulty laser-based system on the PSV caused the loss of signals to both the DGNSSs. However, this could have been caused by interference of the differential correction signal receivers caused by shielding or reflection.
- Information on radio interference is provided in Guidance on Position Reference Systems and Sensors for DP Operations (IMCA M252), Section 4.6 Operational Consideration Summary.
Latest DP incidents
-
Prepare for 2025 solar activity
This case study covers events that occurred on the same vessel, eight months apart.
DPE 02/24
29 July 2024
Undesired event
-
Know your vessel capabilities and when to stop!
An incident that occurred on an equipment class 2 MODU, during well intervention operations.
DPE 02/24
29 July 2024
Incident
-
Duty/not duty, which is the question?
With no steering control of the port azimuth thruster, and no other thrusters operational, the heading of the FPU could not be maintained.
DPE 02/24
29 July 2024
Undesired event
-
You’ve got the ASOG, so now you’ve got to follow it
This case study examines an incident that occurred on an equipment class 2 MODU, during well intervention operations.
DPE 02/24
29 July 2024
Incident
-
Button trouble
A Dynamically Positioned vessel experienced a loss of Dynamic Positioning (DP) control while installing cable within a wind farm.
DPE 01/24
3 April 2024
Incident
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.