Jump to:
Inadequate risk assessment was not completed and TAM and ASOG were not thoroughly reviewed prior to their approval.

Comments
It is mentioned in the report that task appropriate mode (TAM) and activity specific operating guidelines (ASOG) were in use, with the limitation identified for two DGNSS subject to common mode failure.
Considerations
- Use of only two DGNSS was contrary to the MSc.1 / Circ. 1580 requirements. This meant the vessel was not set up in accordance with DP class 2 requirements of 3 position reference systems based on at least two different principles.
- Vessel sensors selection did not appear to comply with DP class 2 requirements, though this non-compliance was not a factor in the incident.
- Task appropriate mode was in place, indicating that a loss of position was acceptable. However, the incident indicates that an adequate risk assessment was not done and TAM and ASOG were not thoroughly reviewed prior to their approvals.
- When the vessel lost its automatic DP control due to the loss of all its PRSs, the position could have been maintained for a period of time using the DP mathematical model.
- The report states that interference from a faulty laser-based system on the PSV caused the loss of signals to both the DGNSSs. However, this could have been caused by interference of the differential correction signal receivers caused by shielding or reflection.
- Information on radio interference is provided in Guidance on Position Reference Systems and Sensors for DP Operations (IMCA M252), Section 4.6 Operational Consideration Summary.
Latest DP incidents
-
Thorough preparation is key
With 4 of 8 diesel generators running and connected to a closed ring bus, and 7 of the 8 thrusters selected to DP, a DP equipment class 3 MODU was set up in Green mode whilst on standby.
DPE 03/24
5 November 2024
Incident
-
There – but not really there
This DP event occurred on a DP equipment class two supply vessel whilst carrying out cargo operations on the starboard side alongside the asset and working at the lee side in the drift-off position.
DPE 03/24
5 November 2024
Incident
-
Equipment Class 3, even if you operate as 'Class 2'
This case study examines a DP incident on an equipment class 3 multi-purpose vessel while operating in good conditions.
DPE 03/24
5 November 2024
Incident
-
Line of sight
This case study covers events onboard a DP equipment class 2 vessel whilst holding position in a turbine field, with three position reference systems selected into DP – DGPS, HPR and Fanbeam.
DPE 03/24
5 November 2024
Incident
-
DP Drill Scenario
DP emergency drill scenarios are included to assist DP vessel management, DPOs / Engineers, and ETOs in conducting DP drills onboard.
DPE 03/24
5 November 2024
Incident
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.