Cooling pipe leak threatens main switchboard

  • DP Event
  • Published on 29 March 2017
  • Generated on 26 December 2024
  • DPE 01/17
  • 2 minute read

Observation

A failure of a plug on a seawater cooling pipe for the AC compressors resulted in flooding in the incinerator room.

DPE 17.01 – Cooling pipe leak threatens main switchboard – DP Observation – Flowchart

Comments

A failure of a plug (old decommissioned cooling line for fridge compressors) on seawater cooling pipe for the Ac compressors resulted in flooding in the incinerator room (the water level was about 2cm depth) with small ingression of water in the engine control room on top of main 440V switchboard through a cable penetration.

The small water ingression (water dripping onto switchboard) was deflected by the design of the switchboard cover (class approved design) with a small quantity of water collecting on top. The quantity of water on top of the switchboard was so small that no immediate action was necessary to remove or control it during the incident. The top of the switchboard was dried after the leak was stopped and accumulated water had been removed from the incinerator room above.

Due to the desire to inspect inside the switchboard, with the vessel on standby but inside the 500m zone, the decision was taken to move outside the 500m zone as a precaution.

The vessel continued operations but remained outside the 500m.

Considerations

  • The good practice of moving outside the 500m zone is noted.
  • Decommissioning of pipework by removal rather than plugging is the preferred method.
  • With only one motion reference unit (MRU) on line its failure would affect the stability of all position reference systems selected to the DP system.
  • Submission of DP observations, as learning opportunities, is much appreciated by members of the IMCA Marine DP Committee.

The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.

IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.

Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.