Both DP operating stations stopped communication
- DP Event
- Published on 10 August 2017
- Generated on 26 December 2024
- DPE 03/17
- 2 minute read
Incident
Jump to:
The report suggests the possibility that the vessel returned to operations without sufficient testing to find the root cause of the problem.
Comments
- It is possible that as the vessel was only recently set up on DP, field arrival trials had not yet been completed.
- The use of DGNSS as the only position reference system for DP equipment class 2 operations is not good practice, however it is recognised that deployment of the CTD beacon could be in preparation for initiating a DP acoustic system.
- It is not clear, from the information provided, of the exact sequence of events: sensors and position reference systems are hard wired to the DP controller or Fieldnet connections, located in the DP controller cabinet, they are not connected directly to the DP OS and therefore position keeping capability should not have been affected by the OS not communicating.
- One possibility is that it was the DP controllers that stopped communicating and caused the problem; if this was the case the question should have been asked how this single point failure could have happened.
- The vessel would probably be controlled better using the independent joystick rather than individual manual control of the thrusters.
- The report suggests the possibility that the vessel returned to operations without sufficient testing to find the root cause of the problem.
Latest DP incidents
-
Prepare for 2025 solar activity
This case study covers events that occurred on the same vessel, eight months apart.
DPE 02/24
29 July 2024
Undesired event
-
Know your vessel capabilities and when to stop!
An incident that occurred on an equipment class 2 MODU, during well intervention operations.
DPE 02/24
29 July 2024
Incident
-
Duty/not duty, which is the question?
With no steering control of the port azimuth thruster, and no other thrusters operational, the heading of the FPU could not be maintained.
DPE 02/24
29 July 2024
Undesired event
-
You’ve got the ASOG, so now you’ve got to follow it
This case study examines an incident that occurred on an equipment class 2 MODU, during well intervention operations.
DPE 02/24
29 July 2024
Incident
-
Button trouble
A Dynamically Positioned vessel experienced a loss of Dynamic Positioning (DP) control while installing cable within a wind farm.
DPE 01/24
3 April 2024
Incident
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.